
MissionseedpublicHospital Novo Horizonte
Halve ward delivery time at Hospital Novo Horizonte by 2027
A concrete problem with an owner, a number and a deadline: ward logistics at a private hospital in São Paulo.
- 3 open needs
Median delivery time in ward B is 41 minutes; nurses do the carrying.
Median delivery time of 20 minutes with the same nursing headcount.
- Who answers for the problem
- Hospital Novo Horizonte, operations directorate
- Territory or context
- São Paulo, Brazil
- Deadline
- Jun 30, 2027
- State
- active
- People or organisations affected
- Nursing staff, patients on ward B, pharmacy
- Restrictions
- No structural retrofit of corridors; elevator vendor contract runs until 2027.
- Success metrics
- Median delivery time; nursing time on logistics per shift; incidents per 1,000 deliveries
Nurses in ward B spend up to a third of each shift moving supplies, samples and meals. The mission is to cut the median delivery time from 41 to 20 minutes with a mixed fleet of wheeled and humanoid robots, without adding headcount.
What we know: two elevators, corridors 1.8 m wide, pharmacy on the ground floor. What we do not know: whether the elevator vendor will open an API, and what the nursing council will accept.
What is missing now3
- A way through·a blocker removed·answered·reward BRL 3,000The elevator vendor has not agreed to open its APIRDRafael Duarte1 response2 days ago
- Someone·an expert·answeredSomeone who has integrated robots with hospital elevatorsRDRafael Duarte1 responseelevator integration · building automation · service robots2 days ago
- Research·research·openWhich hospitals already run mixed robot fleets across elevators?RDRafael Duarteno responses2 days ago
Claims in this investigation
No claims yet. A claim is a falsifiable statement others can support, challenge or evidence.
Evidence
No evidence attached yet.